KRA (Accountabilities) (Max 1325 Characters)
Supporting Actions (Max 1325 Characters)
KRA1
Production
Ensure trouble free operation of the production processes for achieving quality produ
ction and productivity.
To implement production plan
Intra/Inter dept. coordination for required jobs in the shift
Resource planning as per shift requirements.
To follow all SOPs strictly as per QMS.
To follow preventive and predictive maintenance Schedule in coordination with Engg depts.
To guide and maintain all process parameters within allowable range.
Routine plant rounds for identification of abnormalities and taking corrective actions.
Maximise the production ratings with a consistent Quality.
KRA2
Quality Control
To Control the Quality of product within set standards so as to ensure quality production.
To monitor and maintain key process parameters as per product characteristics.
To ensure timely inspection of product quality at each process change to reduce off spec generation.
To apply Statistical Process Control techniques to establish product and process capability.
KRA3
Cost Control
Optimum utilization of Resources & waste minimization to contribute in achieving Purta norms.
Efficient utilization of resources to have maximum productivity.( Yield)
Monitoring consumption of inventory in shift.
Continuous monitoring of cost incurred during Shift in reprocessing, energy loss, waste generation , breakdown, & other quality indicators.
KRA4
Reduction In Plant Stoppage
Reduction in Plant B/Dn. due to process upset to achieve higher productivity.
(This is critical due to inherent nature of industry.)
To safely & timely hand-over of equipment s to Maintenance department for Preventive & Predictive Maintenance. & also provide safety instructions during the activity.
To check the performance of Equipment s after Maintenance.
To take decisions to resume back to normal operation at the earliest.
KRA5
QMS
Compliance to all systems, Procedures & Work Instructions for achieving high standard
s of Work Culture.
To motivate & encourage participative culture through WCM, quality circle, kaizen, 5-S activities.
To percolate and develop understanding of all QMS standards among the team members.
On job training of the shift team.
Sharing departmental expectations and performance during monthly departmental meeting and prepare action plan for improvement projects.
KRA6
Safety
Execution of all activities with utmost importance to Safety.
Supervise regular inspection during the shift to identify problem areas and unsafe practices, unsafe work places & to ensure that agreed corrective actions are fully imp
lemented on time.
Periodically educate all Shift employees on the safety procedures & ensure use of Personal Protective Equipments.
To Prepare Safety Work Permit before carrying out the maintenance jobs.
Facilitate First Aid / Medical attention as required by the employee.
KRA7
Pollution
Monitor and review that all effluent from plant premises are within Pollution Control
Compliance Norms.
Ensure that effluent discharge during the shift is within approved limits.
Ensure optimum consumption of chemicals .
Ensure appropriate steps as required to control / stop emissions at the earliest opportunity , even it requires stoppage.
KRA8
Process MIS
Collate data regarding shift working & communicate to superiors for their necessary information & action
Preparation of shift wise status report after collecting feedback from assisting team and giving feed back to unit head, head production, other departments for actions.
Required data analysis and MIS reports preparation
KRA9
Plant accountability
Ensure smooth functioning of the plant beyond office hours to sustain quality operations.
Safe and smooth operations in terms of technical and administrative functions.
Co-ordination with other dept. shift in-charges by seeking and giving feedback as and
when required.
Taking decisions as a team leader for total plant operation in shifts related to smooth functioning of the plant.
Advising other dept. personnel in shifts for solving operational and administrative issues.
Initiating appropriate action in plant emergency.
18-20 Years
General Manager