Ensure in proper settings of guides and guide tables,
Monitor the size of stock, coupling and spindle, cooling water supply and tend misguided billet and other deviation in the flow of operation in the roughing mill.
Check the measuring devices for any damage and the calibration due date.
Ensure spares available such as, water and lubrication hoses, C-clamps, clamp fastening bolts and nuts. Otherwise inform Shift In-charge.
Ensure spare guides are available on shop floor.
Check the roll cooling water for sufficient flow and also for any nozzle blockage.
Check and tight the guides if they are loose.
15) Follow Company rules and regulations i.e. safety rules and regulations, good housekeeping practices etc.